Which electrical requests need a survey before a date?
Use an enquiry to establish what the customer wants and who will review it. A customer describing an extra socket cannot establish the installation method, condition of existing equipment or work required. Keep professional assessment outside the public booking form.
Fictional example: a small shop asks for additional sockets before opening. The survey identifies work that depends on another contractor. Keep the requested opening date as a target, record the dependency and agree an installation date only after the scope and access are settled.
Separate a survey appointment from an installation request
| Request | Route | Before you confirm |
|---|---|---|
| Something has stopped working | A callback to assess the request | Urgency and whether your business can attend |
| New sockets, lighting or equipment | Installation enquiry and possible site visit | Requirements, access and scope |
| Larger refurbishment | Project survey | Phasing, other contractors and customer availability |
Collect useful site details without asking for a diagnosis
| Information to collect | Suggested field | What it decides |
|---|---|---|
| Which type of work is this? | Fault / Installation / Refurbishment / Other | Avoid one generic appointment |
| What do you want to use or change? | Short text | Understand the intended result |
| Property address and access contact | Address and text | Arrange the right location and person |
| Any photos of the existing area? | Optional file upload | Prepare questions for the survey |
| When would you like the work done? | Text, labelled preferred timing | Distinguish a target from an agreed date |
Turn the survey into an estimate someone can act on
Keep the survey reference, proposed work, exclusions and unanswered decisions with the job. Name the person authorised to accept the proposal. The site contact who lets you in may have no authority to approve a price change.
For the shop example, record the other contractor’s dependency and the next date you will check it. A stage called Waiting is insufficient unless it also says what is missing and who will follow up.
Configure the electrical enquiry pipeline
- Name the form Electrical job request. Ask customers to describe what they notice rather than inspect or open equipment for you.
- Set up stages New request, Technical review, Survey agreed, Quote sent, Accepted and Scheduled. Assign a review task to a qualified member of your team.
- For the home-office example, record equipment use and the requested location. Ask follow-up questions in the same customer conversation.
- Book a survey only once the address and access are agreed. Put the survey in the working calendar so it blocks other commitments.
- Prepare a scope with included work, exclusions and any decisions still outstanding. Confirm an installation date after acceptance and resource checks.
Approval, installation and certification are different milestones
Moving an enquiry to Accepted means the customer agreed the proposal. It does not mean installation is complete, inspected or certified. Use separate stages or a job checklist for those milestones.
Keep technical records and certificates in the system you use for professional work. You can later connect that system to GHL, but a form answer or an automatic email must never stand in for an electrical assessment.
Explain what happens after an electrical enquiry
Hi [first name],
I’ve received your electrical work request. I’ll review what you need and get in touch to discuss the scope and whether a site visit is needed.
Your preferred date is noted. We’ll agree an appointment separately.
[Business name and contact number]Check incomplete site details and unapproved work
| Sample situation | Expected outcome |
|---|---|
| Submit an installation enquiry with no photo | It still creates a review task |
| Submit a fault enquiry | It is clearly marked for human review |
| Move a survey to another day | The customer receives the new time and the old slot is released |
| Mark a quote accepted | No completion or certificate message is sent |
Keep materials and contractor dependencies visible
Before scheduling installation, check materials, access and any other contractor dependencies. Keep an agreed date in the calendar and a next action on the job.
Review enquiries that remain in Technical review. If the same missing detail repeatedly causes a callback, improve that one form question.
Want this built around your business?
Plan my electrical job booking system
Inspection records, certification software connections, material lists, contractor coordination and recurring service reminders can be discussed in a consultation.
Need more features for your business? Book a consultation and we’ll work through what you need.
I can build the setup for you, or help you build it during personal coaching.
Ask me to build it